| 02/10/2026 |
Development And Supply Of Gloves - Preliminary Market Engagement Notice |
PinHigh |
01/12/2026 |
| 02/10/2026 |
Cryogenic Systems For STEP - Preliminary Market Engagement Notice |
PinHigh |
13/11/2026 |
| 01/10/2026 |
Framework For M&E And Compliance - Preliminary Market Engagement Notice |
PinHigh |
06/11/2026 |
| 01/10/2026 |
Lock Gate Repair And Refurbishment - Prior Information Notice |
PinLow |
31/10/2026 |
| 30/09/2026 |
PLC Replacement For Laundry System |
High |
26/10/2026 |
| 29/09/2026 |
Pilot-scale Spray Drying Equipment |
High |
26/10/2026 |
| 29/09/2026 |
Masonry Wall Restoration (Türkiye) |
High |
17/11/2026 |
| 29/09/2026 |
Renewable Energy And Battery Systems |
Low |
19/10/2026 |
| 29/09/2026 |
Roof Reinforcement For Solar Panels |
Low |
19/10/2026 |
| 28/09/2026 |
Managing Agent |
High |
26/10/2026 |
| 28/09/2026 |
Materials Supply Framework Agreement |
High |
09/11/2026 |
| 28/09/2026 |
Furniture And Flooring Framework - Preliminary Market Engagement Notice |
PinHigh |
20/11/2026 |
| 28/09/2026 |
EV Charging Infrastructure Services |
High |
09/10/2026 |
| 25/09/2026 |
Walkway And Balcony Refurbishment |
Low |
15/10/2026 |
| 25/09/2026 |
Marine Infrastructure Maintenance And Supply |
Low |
16/10/2026 |
| 23/09/2026 |
Sample Tubes Supply |
High |
26/10/2026 |
| 23/09/2026 |
Steel Structure Fabrication And Delivery |
Low |
19/10/2026 |
| 21/09/2026 |
EV Infrastructure Delivery And Management |
High |
19/10/2026 |
| 21/09/2026 |
Interior Design For Market Redevelopment |
Low |
05/10/2026 |
| 18/09/2026 |
Marine Vessel Refit Framework - Preliminary Market Engagement Notice |
PinHigh |
01/12/2026 |
| 18/09/2026 |
Pool Filtration Refurbishment |
Low |
23/10/2026 |
| 18/09/2026 |
Chiller Unit Replacement And Installation |
Low |
19/10/2026 |
| 18/09/2026 |
Library And Museum Refurbishment |
High |
16/10/2026 |
| 18/09/2026 |
Mobile Transformer Oil Processing Vehicles - Planned Procurement Notice |
PinHigh |
07/12/2026 |
| 18/09/2026 |
Solar Farm And BESS Design |
Low |
16/10/2026 |
| 17/09/2026 |
VOC And Dust Control System |
High |
20/10/2026 |
| 17/09/2026 |
Theatre Chiller Replacement Works |
High |
15/10/2026 |
| 16/09/2026 |
Multidisciplinary Design And Management Services |
High |
16/10/2026 |
| 15/09/2026 |
Subcontractor Opportunities Event |
Low |
16/10/2026 |
| 15/09/2026 |
Bridge Replacement And Paths - Prior Information Notice |
PinLow |
15/10/2026 |
| 14/09/2026 |
Substation Equipment Supply - Planned Procurement Notice |
PinHigh |
30/11/2026 |
| 11/09/2026 |
Construction Of Cattle Grids (Falkland Islands) |
Low |
08/10/2026 |
| 11/09/2026 |
Annual Servicing Of HVAC Systems |
Low |
09/10/2026 |
| 11/09/2026 |
Modular A-frame Procurement - Pipeline Notice |
PinHigh |
28/01/2027 |
| 10/09/2026 |
Transmission System Design And Manufacture |
High |
09/10/2026 |
| 09/09/2026 |
Supply Of Over-labelled Medicines - Preliminary Market Engagement Notice |
PinHigh |
26/10/2026 |
| 09/09/2026 |
Low-carbon Technologies Purchasing Scheme - Preliminary Market Engagement Notice |
PinHigh |
07/10/2026 |
| 09/09/2026 |
Manufacturing Consumables Supply |
High |
09/10/2026 |
| 08/09/2026 |
Substation Enclosures Supply - Planned Procurement Notice |
PinHigh |
18/11/2026 |
| 08/09/2026 |
LPCB Certified Security Equipment |
High |
12/10/2026 |
| 03/09/2026 |
Control System Replacement Framework - Preliminary Market Engagement Notice |
PinHigh |
09/10/2026 |
| 28/08/2026 |
Civil Engineering Contractors Framework - Planned Procurement Notice |
PinHigh |
16/11/2026 |
| 27/08/2026 |
Framework For Laboratory Supplies |
High |
05/10/2026 |
| 27/08/2026 |
Minor Works Framework Agreement |
High |
06/10/2026 |
| 27/08/2026 |
Specialist platform support equipment |
Low |
01/04/2027 |
| 24/08/2026 |
Specialist Equipment Support Services - Pipeline Notice |
PinHigh |
01/03/2027 |
| 20/08/2026 |
Strategic Fuel Hub Construction (Gibraltar) - Pipeline Notice |
PinHigh |
02/11/2026 |
| 19/08/2026 |
Insulated Rail Joints Supply - Pipeline Notice |
PinHigh |
16/02/2027 |
| 18/08/2026 |
Marine Vessel Refit Framework - Pipeline Notice |
PinHigh |
30/11/2026 |
| 14/08/2026 |
Building And Construction Materials Framework |
High |
09/10/2026 |
| 05/08/2026 |
Modular Furniture For Navy Vessels - Pipeline Notice |
PinHigh |
23/10/2026 |
| 29/07/2026 |
Rock Salt Supply - Pipeline Notice |
PinHigh |
26/02/2029 |
| 29/07/2026 |
Rope Supply Contract - Pipeline Notice |
PinHigh |
12/06/2029 |
| 29/07/2026 |
Jerricans And Consumables Supply - Pipeline Notice |
PinHigh |
15/12/2027 |
| 29/07/2026 |
Pollution Control Sorbents Supply - Pipeline Notice |
PinHigh |
12/09/2028 |
| 29/07/2026 |
Chemical Supply Services - Pipeline Notice |
PinHigh |
27/01/2028 |
| 29/07/2026 |
De-icing Products Supply - Pipeline Notice |
PinHigh |
11/02/2027 |
| 29/07/2026 |
Plastic, Rubber, Cork Supply - Pipeline Notice |
PinHigh |
04/12/2028 |
| 29/07/2026 |
Capital Works Delivery Frameworks - Preliminary Market Engagement Notice |
PinHigh |
30/11/2026 |
| 21/07/2026 |
Life Sciences Equipment And Services - Preliminary Market Engagement Notice |
PinHigh |
12/10/2026 |
| 14/07/2026 |
Highways And Structures Framework - Planned Procurement Notice |
PinHigh |
16/10/2026 |
| 09/07/2026 |
Runway De-icer Supply - Preliminary Market Engagement Notice |
PinHigh |
31/10/2026 |
| 01/06/2026 |
Water Jetting Pump Services - Pipeline Notice |
PinHigh |
31/07/2027 |
| 29/05/2026 |
Estates And Facilities Services DPS - Pipeline Notice |
PinHigh |
01/08/2027 |
| 27/05/2026 |
Consultancy For Assets And Investments - Pipeline Notice |
PinHigh |
10/11/2026 |
| 26/05/2026 |
Rolling Stock Seat Repair Framework - Pipeline Notice |
PinHigh |
|
| 26/05/2026 |
Rail Supply Including Conductor Rail - Pipeline Notice |
PinHigh |
24/06/2029 |
| 26/05/2026 |
Rail Supply And Components - Pipeline Notice |
PinHigh |
24/06/2029 |
| 22/05/2026 |
Design Services For Campus Buildings - Pipeline Notice |
PinHigh |
|
| 22/05/2026 |
Data Centre Equipment Framework - Pipeline Notice |
PinHigh |
01/06/2027 |
| 22/05/2026 |
Bulk Adhesion Modifier Supply - Pipeline Notice |
PinHigh |
10/01/2027 |
| 22/05/2026 |
Specialist Valves Supply And Support - Pipeline Notice |
PinHigh |
27/10/2026 |
| 22/05/2026 |
Construction Services Framework - Pipeline Notice |
PinHigh |
01/04/2027 |
| 22/05/2026 |
Furniture Design And Planning - Pipeline Notice |
PinHigh |
01/03/2027 |
| 21/05/2026 |
Temporary Power Generator Framework - Pipeline Notice |
PinHigh |
26/03/2029 |
| 19/05/2026 |
Design And Build Industrial Units - Pipeline Notice |
PinHigh |
01/12/2026 |
| 11/05/2026 |
Lubricants, Greases And Antifreeze - Pipeline Notice |
PinHigh |
06/11/2026 |
| 08/05/2026 |
Furniture Services And Goods Framework - Pipeline Notice |
PinHigh |
03/05/2027 |
| 07/05/2026 |
Folding Tables And Chairs Framework - Pipeline Notice |
PinHigh |
03/09/2027 |
| 07/05/2026 |
Handling Equipment And Shelving Framework - Pipeline Notice |
PinHigh |
03/09/2027 |
| 07/05/2026 |
National Framework For Furniture Supply - Pipeline Notice |
PinHigh |
03/09/2027 |
| 05/05/2026 |
Construction Consultancy Framework - Planned Procurement Notice |
PinHigh |
27/11/2026 |
| 05/05/2026 |
Framework For Technical Support Services - Pipeline Notice |
PinHigh |
01/12/2026 |
| 30/04/2026 |
Property Maintenance And Improvement Services - Dynamic Market Intention Notice |
PinHigh |
30/06/2036 |
| 21/04/2026 |
Mechanical And Electrical Services Framework - Pipeline Notice |
PinHigh |
01/08/2027 |
| 13/04/2026 |
Framework For Oils And Lubricants - Pipeline Notice |
PinHigh |
01/01/2027 |
| 23/03/2026 |
Electric Vehicle Charging Support - Pipeline Notice |
PinHigh |
|
| 12/03/2026 |
Dynamic Market For Regenerative Procurement - Dynamic Market Intention Notice |
PinHigh |
31/03/2036 |
| 11/03/2026 |
Valves And Actuators Supply - Preliminary Market Engagement Notice |
PinHigh |
|
| 06/03/2026 |
Dynamic Market For Estates Works - Dynamic Market Intention Notice |
PinHigh |
09/03/2031 |
| 02/02/2026 |
Vehicle Charging Infrastructure DPS |
High |
23/02/2029 |
| 29/01/2026 |
Vehicle Charging Infrastructure DPS |
High |
23/02/2029 |
| 17/12/2025 |
Highway Electrical Installation Services |
High |
23/02/2029 |
| 12/12/2025 |
Furniture And Associated Services - Pipeline Notice |
PinHigh |
|
| 18/11/2025 |
Laboratory Consumables & Chemicals - Pipeline notice |
PinHigh |
|
| 18/07/2025 |
DPS for energy efficiency measures & renewable technology installations |
Low |
18/02/2029 |
| 16/05/2025 |
Product research and development service - Pipeline notice |
PinHigh |
30/05/2029 |
| 20/02/2025 |
DPS for Electrical Consumables |
High |
20/02/2029 |
| 19/02/2025 |
DPS for Energy Efficiency Services |
High |
19/02/2029 |
| 18/02/2025 |
Professional consultant services - DPS |
High |
23/02/2029 |