| 09/06/2026 |
Asbestos Consultancy And Air Monitoring |
Low |
06/07/2026 |
| 09/06/2026 |
Equipment Servicing And Maintenance - Prior Information Notice |
PinHigh |
09/07/2026 |
| 09/06/2026 |
Building Condition Survey Services - Preliminary Market Engagement Notice |
PinHigh |
22/06/2026 |
| 09/06/2026 |
Roadside Survey For VED Compliance - Preliminary Market Engagement Notice |
PinHigh |
09/06/2026 |
| 09/06/2026 |
Pool Systems Servicing And Maintenance |
High |
14/07/2026 |
| 09/06/2026 |
Ancient Woodland Condition Surveys |
Low |
22/06/2026 |
| 08/06/2026 |
Highway Asset Condition Surveys - Preliminary Market Engagement Notice |
PinHigh |
24/06/2026 |
| 08/06/2026 |
Bridge Structural Investigation Works |
Low |
29/06/2026 |
| 08/06/2026 |
Off-gas Monitoring System Supply |
Low |
29/06/2026 |
| 08/06/2026 |
Gas Training Equipment Supply |
High |
22/06/2026 |
| 08/06/2026 |
Subsea Cable Protection Services - Planned Procurement Notice |
PinHigh |
04/09/2026 |
| 08/06/2026 |
Temperature Logger Supply And Services - Preliminary Market Engagement Notice |
PinHigh |
17/07/2026 |
| 08/06/2026 |
Inspection Of Pressure Systems |
High |
08/07/2026 |
| 08/06/2026 |
Consultancy Services Frameworks - Preliminary Market Engagement Notice |
PinHigh |
30/06/2026 |
| 08/06/2026 |
Radiocarbon Dating And Analysis |
High |
08/07/2026 |
| 08/06/2026 |
Integrated Energy Sub-metering System |
Low |
20/07/2026 |
| 08/06/2026 |
Topographic And Building Surveys |
High |
06/07/2026 |
| 05/06/2026 |
Dosimetry Services And Record-keeping |
High |
03/07/2026 |
| 05/06/2026 |
Ground-based Radar Testing - Preliminary Market Engagement Notice |
PinHigh |
18/08/2026 |
| 05/06/2026 |
Environmental Monitoring Systems Maintenance And Upgrades |
High |
08/07/2026 |
| 05/06/2026 |
Dredging And Survey Works |
Low |
06/07/2026 |
| 05/06/2026 |
Building Consultancy DPS Services |
High |
20/05/2036 |
| 05/06/2026 |
Integrated Source Protection Services |
Low |
03/07/2026 |
| 05/06/2026 |
Science Laboratory Refurbishment Works |
Low |
05/07/2026 |
| 05/06/2026 |
Hydrological Assessment Stage 1 Report |
Low |
03/07/2026 |
| 05/06/2026 |
Flue Gas Abatement System Design |
Low |
26/06/2026 |
| 05/06/2026 |
Integrated Source Protection Plan Services |
Low |
03/07/2026 |
| 05/06/2026 |
Enabling Design For Site Works - Planned Procurement Notice |
PinHigh |
17/07/2026 |
| 05/06/2026 |
Audits For Renewable Schemes |
High |
06/07/2026 |
| 05/06/2026 |
Asbestos Services Framework |
High |
17/07/2026 |
| 05/06/2026 |
Calibration And Repair Services - Preliminary Market Engagement Notice |
PinHigh |
19/06/2026 |
| 05/06/2026 |
Remote Video Viewing Aids Supply |
High |
24/07/2026 |
| 05/06/2026 |
Statutory Inspections Services |
Low |
19/06/2026 |
| 05/06/2026 |
Dilution Refrigerator With Magnet |
High |
17/07/2026 |
| 05/06/2026 |
Environmental Monitoring For Metrolink |
High |
09/07/2026 |
| 05/06/2026 |
Flow Measurement Consumables Support - Planned Procurement Notice |
PinHigh |
29/07/2026 |
| 05/06/2026 |
Isothermal Calorimeter Purchase |
Low |
15/06/2026 |
| 04/06/2026 |
Specialist Engineering And Technical Services - Preliminary Market Engagement Notice |
PinHigh |
31/07/2026 |
| 04/06/2026 |
LOLER Inspection Services For Equipment |
High |
09/07/2026 |
| 04/06/2026 |
Geophysical And Sub-surface Surveys |
High |
06/07/2026 |
| 04/06/2026 |
Inspection And Audit Of Vehicles |
High |
24/07/2026 |
| 04/06/2026 |
Consultant Team For School Project - Planned Procurement Notice |
PinHigh |
24/07/2026 |
| 04/06/2026 |
Metrology Lab Equipment Procurement |
High |
02/07/2026 |
| 04/06/2026 |
Heating And Water Maintenance Contracts |
High |
09/07/2026 |
| 04/06/2026 |
Refurbishment Works For Suite |
Low |
25/06/2026 |
| 03/06/2026 |
Environmental Sampling And Disease Analysis - Prior Information Notice |
PinLow |
17/06/2026 |
| 03/06/2026 |
Air Quality Monitoring Services |
Low |
25/06/2026 |
| 03/06/2026 |
Public Realm Upgrades Surveys |
Low |
24/06/2026 |
| 03/06/2026 |
Ebola Diagnostic Tests - Preliminary Market Engagement Notice |
PinHigh |
17/06/2026 |
| 03/06/2026 |
Legionella And Water Monitoring |
High |
03/07/2026 |
| 03/06/2026 |
Reactive Support And Equipment Hire |
High |
28/06/2026 |
| 03/06/2026 |
Radiation Monitoring And Dosimetry |
High |
29/06/2026 |
| 02/06/2026 |
Nature Conservation Consultancy Framework |
High |
28/07/2026 |
| 02/06/2026 |
Water Hygiene And Legionella Services |
High |
01/07/2026 |
| 02/06/2026 |
Environmental Radioactivity Monitoring Framework |
High |
03/07/2026 |
| 02/06/2026 |
Housing Stock Condition Surveys |
High |
02/07/2026 |
| 02/06/2026 |
Passive Acoustic Monitoring Array |
Low |
24/06/2026 |
| 02/06/2026 |
1D Motion Stage System - Planned Procurement Notice |
PinHigh |
07/08/2026 |
| 02/06/2026 |
Business case framework for termination monitoring |
Low |
13/07/2026 |
| 02/06/2026 |
Maintenance of Biogas & and Digester Assets |
Low |
28/08/2026 |
| 02/06/2026 |
Post-occupancy Evaluation For Schools |
Low |
15/06/2026 |
| 01/06/2026 |
Consultancy Framework For Infrastructure - Pipeline Notice |
PinHigh |
05/10/2026 |
| 01/06/2026 |
Radiation Dosimetry And Monitoring - Prior Information Notice |
PinHigh |
30/06/2026 |
| 01/06/2026 |
Lab Equipment Maintenance And Calibration |
High |
26/06/2026 |
| 01/06/2026 |
Hire Of Weighbridge Test Unit |
High |
03/07/2026 |
| 01/06/2026 |
Repairs, Maintenance, And Planned Works |
High |
26/06/2026 |
| 01/06/2026 |
Atmosphere Monitoring Systems - Pipeline Notice |
PinHigh |
01/03/2027 |
| 01/06/2026 |
EICR And Remedial Services |
High |
28/06/2026 |
| 01/06/2026 |
Gas Detection Systems Maintenance |
High |
26/06/2026 |
| 01/06/2026 |
FFP3 Fit Testing Capacity - Preliminary Market Engagement Notice |
PinHigh |
23/06/2026 |
| 01/06/2026 |
Fuel Monitoring System Installation - Preliminary Market Engagement Notice |
PinHigh |
03/07/2026 |
| 29/05/2026 |
Hydrological Assessment Stage 1 Report |
Low |
26/06/2026 |
| 29/05/2026 |
Underwater Acoustics Test Facility - Preliminary Market Engagement Notice |
PinHigh |
26/06/2026 |
| 29/05/2026 |
Underground Infrastructure Maintenance Framework - Preliminary Market Engagement Notice |
PinHigh |
12/06/2026 |
| 29/05/2026 |
Functional Testing Of Pd Ag Membranes |
High |
29/06/2026 |
| 29/05/2026 |
Estates And Facilities Services DPS - Pipeline Notice |
PinHigh |
01/08/2027 |
| 29/05/2026 |
Gas And Electrical Audits |
High |
29/06/2026 |
| 29/05/2026 |
High Temperature Superconducting Rotor System - Planned Procurement Notice |
PinHigh |
16/06/2026 |
| 29/05/2026 |
Facilities Management Framework Services - Pipeline Notice |
PinHigh |
18/10/2027 |
| 29/05/2026 |
Steel, Concrete And Waterproofing Inspections (Europe) |
Low |
12/06/2026 |
| 29/05/2026 |
Support For Water Pump Systems |
High |
10/07/2026 |
| 29/05/2026 |
Meter Operator Services Framework - Preliminary Market Engagement Notice |
PinHigh |
12/06/2026 |
| 28/05/2026 |
Marine Stewardship Council Assessment |
Low |
22/06/2026 |
| 28/05/2026 |
Water Safety Assessments And Testing |
High |
29/06/2026 |
| 28/05/2026 |
Structural Hidden Elements Examination - Pipeline Notice |
PinHigh |
31/07/2026 |
| 28/05/2026 |
Redevelopment Consultancy Services |
High |
26/06/2026 |
| 28/05/2026 |
Fuel Cycle System Partnership - Preliminary Market Engagement Notice |
PinHigh |
23/06/2026 |
| 28/05/2026 |
Replacement Of Airport Ndbs |
High |
29/06/2026 |
| 28/05/2026 |
Specialist Advisory For Oil And Gas - Dynamic Market Intention Notice |
PinHigh |
26/10/2029 |
| 28/05/2026 |
Maintenance And Safety Recertification - Planned Procurement Notice |
PinHigh |
20/08/2026 |
| 28/05/2026 |
Technical And Professional Services Framework - Pipeline Notice |
PinHigh |
01/10/2026 |
| 28/05/2026 |
Electrical Testing And Repair Services |
High |
26/06/2026 |
| 28/05/2026 |
Site Investigation Services Contract |
High |
26/06/2026 |
| 28/05/2026 |
Site Investigation Services - Pipeline Notice |
PinHigh |
27/06/2026 |
| 28/05/2026 |
Consultant For Rice Supply Chain (Indonesia) |
High |
13/07/2026 |
| 28/05/2026 |
Framework For Educational Equipment - Preliminary Market Engagement Notice |
PinHigh |
10/07/2026 |
| 28/05/2026 |
Gas Metering Support Services - Pipeline Notice |
PinHigh |
01/10/2026 |
| 28/05/2026 |
Water System Hygiene Services - Pipeline Notice |
PinHigh |
|
| 28/05/2026 |
DNA Analysis Instrumentation - Prior Information Notice |
PinLow |
02/07/2026 |
| 27/05/2026 |
Surveying Services For Assets - Pipeline Notice |
PinHigh |
10/11/2026 |