| 12/10/2026 |
Painting Of Walkway Tower Section (Ireland) |
Low |
20/11/2026 |
| 12/10/2026 |
Consulting Engineering Services For Water Scheme |
Low |
02/11/2026 |
| 12/10/2026 |
Electrical Maintenance And Reporting Services |
High |
19/11/2026 |
| 12/10/2026 |
Design And Build Housing Units |
High |
10/11/2026 |
| 09/10/2026 |
Architect-led Design For Fire Station |
High |
11/11/2026 |
| 09/10/2026 |
Architect-led Design For Redevelopment |
High |
06/11/2026 |
| 08/10/2026 |
Design Team For Community Dwelling (Republic of Ireland) |
Low |
13/11/2026 |
| 08/10/2026 |
Managed Parking Services Provision |
High |
09/11/2026 |
| 08/10/2026 |
District Heat Advisory Framework |
High |
09/11/2026 |
| 08/10/2026 |
Auxiliary Boiler Replacement Project |
High |
05/11/2026 |
| 07/10/2026 |
Consultant For Electrical Safety Works |
Low |
13/10/2026 |
| 07/10/2026 |
Design And Build Contract - Prior Information Notice |
PinLow |
20/10/2026 |
| 07/10/2026 |
Campus Heating System Decentralization |
High |
02/11/2026 |
| 07/10/2026 |
Greenway Construction And Improvements |
High |
12/11/2026 |
| 06/10/2026 |
Outdoor Rehabilitation Space Works |
Low |
30/10/2026 |
| 06/10/2026 |
Electrical Infrastructure Works Framework |
High |
05/11/2026 |
| 06/10/2026 |
Automotive Training Equipment Supply |
High |
06/11/2026 |
| 05/10/2026 |
Sodium Hydroxide Solution Supply |
Low |
30/10/2026 |
| 05/10/2026 |
Painting Works For Pilot Plant |
Low |
19/10/2026 |
| 05/10/2026 |
MEICA Works Market Engagement - Prior Information Notice |
PinLow |
20/10/2026 |
| 02/10/2026 |
Solar PV System And EV Chargers |
Low |
30/10/2026 |
| 02/10/2026 |
Decarbonisation Works With Heat Pumps |
Low |
02/11/2026 |
| 02/10/2026 |
Town Centre Refurbishment Works |
Low |
19/11/2026 |
| 02/10/2026 |
Network Upgrade And Connections |
Low |
30/10/2026 |
| 02/10/2026 |
Design Team For Transport Hub |
High |
06/11/2026 |
| 02/10/2026 |
Framework For Project Management Services |
High |
02/11/2026 |
| 02/10/2026 |
Mechanical And Carpentry Services |
High |
11/11/2026 |
| 01/10/2026 |
Breathing Apparatus Compressors Supply |
Low |
22/10/2026 |
| 01/10/2026 |
Electrical Upgrades For Brewing Centre |
Low |
22/10/2026 |
| 01/10/2026 |
Pier Structural Repairs |
Low |
22/10/2026 |
| 01/10/2026 |
Flood Prevention And Structural Works |
Low |
02/11/2026 |
| 01/10/2026 |
Fire Water Tanks Installation |
Low |
16/10/2026 |
| 01/10/2026 |
Design Team Services Framework |
High |
06/11/2026 |
| 01/10/2026 |
Europort Facilities And Repairs |
High |
04/11/2026 |
| 30/09/2026 |
Heat Pump Works For Schools |
High |
02/11/2026 |
| 30/09/2026 |
Station Capacity Enhancement Works |
High |
20/11/2026 |
| 30/09/2026 |
Electric Vehicle Chargepoint Services |
Low |
06/11/2026 |
| 29/09/2026 |
Engineering Consultancy For Link Roads |
Low |
06/11/2026 |
| 29/09/2026 |
Fire Safety And Wifi-das Systems |
Low |
30/10/2026 |
| 29/09/2026 |
School Safe Routes Scheme |
Low |
19/10/2026 |
| 29/09/2026 |
Masonry Wall Restoration (Türkiye) |
High |
17/11/2026 |
| 29/09/2026 |
Disability Respite Housing Design |
High |
23/10/2026 |
| 28/09/2026 |
Gantry Crane Design And Installation |
Low |
30/10/2026 |
| 28/09/2026 |
Design And Construction Of Tower |
Low |
02/11/2026 |
| 28/09/2026 |
Vehicle Threat Mitigation Bollards |
High |
26/10/2026 |
| 28/09/2026 |
Architect-led Design For Pontoon |
High |
27/10/2026 |
| 28/09/2026 |
Tools And Equipment Supply |
Low |
19/10/2026 |
| 25/09/2026 |
Construction Of 24-space Carpark |
Low |
23/10/2026 |
| 25/09/2026 |
Generator Maintenance And Repair Contract |
Low |
23/10/2026 |
| 24/09/2026 |
Skatepark And Public Space Works |
Low |
22/10/2026 |
| 24/09/2026 |
Laneway And Churchyard Enhancement |
Low |
16/10/2026 |
| 23/09/2026 |
Architectural Design For Offices |
Low |
30/10/2026 |
| 23/09/2026 |
Multidisciplinary Services For Road Scheme |
High |
23/10/2026 |
| 23/09/2026 |
Hydraulics Training Systems Supply |
High |
26/10/2026 |
| 22/09/2026 |
Architect-led Design For Construction |
Low |
13/10/2026 |
| 22/09/2026 |
Feasibility Study For Swimming Pool |
Low |
26/10/2026 |
| 22/09/2026 |
Integrated Design Team Framework |
High |
19/10/2026 |
| 22/09/2026 |
Architect-led Fire Safety Design |
High |
19/10/2026 |
| 22/09/2026 |
Road And Service Upgrade Works |
Low |
20/10/2026 |
| 21/09/2026 |
Water Supply Upgrade Works |
Low |
16/10/2026 |
| 21/09/2026 |
Wooden Boardwalk Replacement Works |
High |
19/10/2026 |
| 21/09/2026 |
Design Team For Business Centre |
High |
23/10/2026 |
| 18/09/2026 |
Bridge Replacement And Rehabilitation |
Low |
20/10/2026 |
| 18/09/2026 |
Offshore Wind Turbine Consultation - Prior Information Notice |
PinLow |
27/11/2026 |
| 18/09/2026 |
Architect-led Design Team Framework |
High |
04/11/2026 |
| 18/09/2026 |
Integrated Design Team Consultancy |
High |
20/10/2026 |
| 18/09/2026 |
Adaptable Workstation Frames Design |
High |
19/10/2026 |
| 17/09/2026 |
Feasibility Study For Apartment Reuse |
Low |
16/10/2026 |
| 17/09/2026 |
Steel Sections And Plates Supply |
High |
21/10/2026 |
| 15/09/2026 |
Semi-automatic Cartoning Machine Supply |
Low |
15/10/2026 |
| 15/09/2026 |
Architect-led Design For Remediation (Ireland) |
High |
14/10/2026 |
| 15/09/2026 |
Framework For Modular Meeting Booths |
High |
14/10/2026 |
| 11/09/2026 |
Mixed-use Redevelopment Design Services |
Low |
14/10/2026 |
| 11/09/2026 |
Community Sports Hall Construction |
Low |
15/10/2026 |
| 11/09/2026 |
Plumbing And Heating Supplies Framework |
High |
16/10/2026 |
| 10/09/2026 |
Multidisciplinary Design Team Services |
High |
15/10/2026 |
| 08/09/2026 |
Automotive Paints And Accessories Supply |
High |
18/10/2026 |
| 31/08/2026 |
EV Charger Supply And Install |
High |
29/08/2027 |
| 28/08/2026 |
Pressure Reduction And Metering Systems |
High |
26/08/2036 |
| 20/08/2026 |
Strategic Fuel Hub Construction (Gibraltar) - Pipeline Notice |
PinHigh |
02/11/2026 |
| 30/07/2026 |
Engineering And Maintenance Qualification System |
High |
25/07/2036 |
| 27/07/2026 |
Survey Qualification System |
High |
21/08/2033 |
| 30/06/2026 |
DPS For Course Consumables |
High |
26/06/2031 |
| 11/05/2026 |
Vehicle Spare Parts Qualification |
High |
30/04/2033 |
| 08/05/2026 |
DPS For Teaching Equipment Supply |
High |
05/05/2031 |
| 10/04/2026 |
Polyethylene Pipe And Fittings Supply (Ireland) |
High |
09/04/2036 |
| 18/02/2026 |
High Tensile Steel Wire Supply |
High |
31/10/2031 |
| 10/02/2026 |
Metal Supply DPS Framework |
High |
08/02/2031 |
| 04/02/2026 |
Electric Vehicle Chargers |
High |
04/02/2031 |
| 14/01/2026 |
EV Equipment Supply And Maintenance |
High |
14/01/2027 |
| 20/11/2025 |
Engineering, Procurement & Construction Services |
High |
20/11/2035 |
| 30/10/2025 |
Electric Drive Compressor - Qualification System |
High |
30/10/2035 |
| 09/10/2025 |
Fabrication Services - Qualification System |
High |
28/02/2029 |
| 04/09/2025 |
Gas Turbines - Qualification System |
High |
04/09/2028 |
| 08/08/2025 |
Steam Generators Works - Qualification System |
High |
08/08/2028 |
| 21/05/2025 |
External Members - Qualification System |
High |
21/05/2028 |
| 30/04/2025 |
Maintenance & Repair Works - Qualification System |
High |
02/06/2045 |
| 18/12/2024 |
Energy Storage System(s) - Qualification System |
High |
18/12/2027 |
| 27/09/2024 |
Water Utilities Services - Dynamic Purchasing System |
High |
01/11/2029 |
| 31/07/2024 |
Electrical Works - Qualification System |
High |
31/07/2027 |