| 02/10/2026 |
Design Team For Transport Hub |
High |
06/11/2026 |
| 02/10/2026 |
Framework For Project Management Services |
High |
02/11/2026 |
| 02/10/2026 |
Mechanical And Carpentry Services |
High |
11/11/2026 |
| 02/10/2026 |
Stormwater Remediation Framework |
Low |
19/10/2026 |
| 02/10/2026 |
School Accommodation And Upgrades |
Low |
22/10/2026 |
| 01/10/2026 |
Plumbing Training Workshop Construction |
Low |
27/10/2026 |
| 01/10/2026 |
Electrical Upgrades For Brewing Centre |
Low |
22/10/2026 |
| 01/10/2026 |
Turnkey Starter Homes Development - Prior Information Notice |
PinLow |
31/12/2026 |
| 01/10/2026 |
Pier Structural Repairs |
Low |
22/10/2026 |
| 01/10/2026 |
Flood Prevention And Structural Works |
Low |
02/11/2026 |
| 01/10/2026 |
Padel Court Design And Installation |
Low |
30/10/2026 |
| 01/10/2026 |
Fire Water Tanks Installation |
Low |
16/10/2026 |
| 01/10/2026 |
Residential Units Construction |
Low |
30/10/2026 |
| 01/10/2026 |
Flood Defence Design Framework |
High |
30/10/2026 |
| 30/09/2026 |
Biomass Heating And Building Works |
Low |
22/10/2026 |
| 30/09/2026 |
Arborist Facility Construction Works |
Low |
28/10/2026 |
| 30/09/2026 |
Building Conservation And Repairs |
Low |
22/10/2026 |
| 30/09/2026 |
Heat Pump Works For Schools |
Low |
21/10/2026 |
| 30/09/2026 |
Construction Of Residential Units |
Low |
30/10/2026 |
| 30/09/2026 |
Window And Door Replacement Works |
High |
29/10/2026 |
| 30/09/2026 |
Agricultural And Warehouse Equipment Supply (Ukraine) |
Low |
15/10/2026 |
| 30/09/2026 |
Heat Pump Works For Schools |
High |
02/11/2026 |
| 30/09/2026 |
Public Realm And Building Works |
High |
30/10/2026 |
| 30/09/2026 |
Station Capacity Enhancement Works |
High |
20/11/2026 |
| 29/09/2026 |
Engineering Consultancy For Link Roads |
Low |
06/11/2026 |
| 29/09/2026 |
Bridge Barrier Mitigation Consultancy |
Low |
21/10/2026 |
| 29/09/2026 |
School Safe Routes Scheme |
Low |
19/10/2026 |
| 29/09/2026 |
Masonry Wall Restoration (Türkiye) |
High |
17/11/2026 |
| 29/09/2026 |
Disability Respite Housing Design |
High |
23/10/2026 |
| 28/09/2026 |
Carpet Tile Removal And Replacement |
Low |
08/10/2026 |
| 28/09/2026 |
Maintenance Works For Nature Properties |
Low |
10/11/2026 |
| 28/09/2026 |
Excavator And Trailer Supply |
Low |
11/11/2026 |
| 28/09/2026 |
Gantry Crane Design And Installation |
Low |
30/10/2026 |
| 28/09/2026 |
Watermain Replacement And Booster Installation |
Low |
17/11/2026 |
| 28/09/2026 |
Quay Wall Structural Survey |
Low |
27/10/2026 |
| 28/09/2026 |
Eradication Of Invasive Plants |
Low |
16/10/2026 |
| 28/09/2026 |
Design And Construction Of Tower |
Low |
02/11/2026 |
| 28/09/2026 |
Architect-led Design For Pontoon |
High |
27/10/2026 |
| 28/09/2026 |
Framework For Artist Workspace Services |
High |
27/10/2026 |
| 28/09/2026 |
Tools And Equipment Supply |
Low |
19/10/2026 |
| 27/09/2026 |
Simulation Ambulance For Training |
Low |
21/10/2026 |
| 25/09/2026 |
Construction Of 24-space Carpark |
Low |
23/10/2026 |
| 25/09/2026 |
Drainage Maintenance Contract |
Low |
23/10/2026 |
| 25/09/2026 |
Generator Maintenance And Repair Contract |
Low |
23/10/2026 |
| 25/09/2026 |
Window And Door Replacement |
Low |
07/10/2026 |
| 25/09/2026 |
Bungalow Extension And Refurbishment (Ireland) |
Low |
30/10/2026 |
| 25/09/2026 |
Building Internal Alterations And Upgrades |
Low |
16/10/2026 |
| 25/09/2026 |
Architectural Consultancy For Roof Works |
Low |
13/11/2026 |
| 25/09/2026 |
Indoor Athletics Training Centre Construction |
High |
13/11/2026 |
| 25/09/2026 |
School Extensions And Refurbishments |
High |
23/10/2026 |
| 25/09/2026 |
Framework For Dwelling Refurbishment |
High |
27/10/2026 |
| 25/09/2026 |
Consultancy For Public Amenity Design |
High |
27/10/2026 |
| 25/09/2026 |
Pipework Installation And Replacement |
Low |
22/10/2026 |
| 24/09/2026 |
Science Laboratory Upgrades Contractor (Republic of Ireland) |
Low |
16/10/2026 |
| 24/09/2026 |
Skatepark And Public Space Works |
Low |
22/10/2026 |
| 24/09/2026 |
Engineering Supervision And Certification |
Low |
16/10/2026 |
| 24/09/2026 |
Fire Safety And Building Works |
Low |
30/10/2026 |
| 24/09/2026 |
Flood Relief Ground Investigation |
Low |
23/10/2026 |
| 24/09/2026 |
Boundary Wall Replacement Works |
Low |
16/10/2026 |
| 24/09/2026 |
Apprentice Workshops New Build |
Low |
23/10/2026 |
| 24/09/2026 |
Window And Door Replacement Works (Republic of Ireland) |
Low |
12/10/2026 |
| 24/09/2026 |
Passive Fireproofing Systems Installation |
Low |
09/10/2026 |
| 24/09/2026 |
Oil Spill Bowsers With Attachments |
Low |
08/10/2026 |
| 24/09/2026 |
Portable Welfare And Drying Units |
Low |
15/10/2026 |
| 24/09/2026 |
Hydraulic Excavators Supply |
High |
23/10/2026 |
| 24/09/2026 |
Site Investigation For Infrastructure |
Low |
15/10/2026 |
| 24/09/2026 |
Laneway And Churchyard Enhancement |
Low |
16/10/2026 |
| 23/09/2026 |
Pontoon Upgrade And Installation |
Low |
07/10/2026 |
| 23/09/2026 |
ESB Enabling Works Installation |
Low |
22/10/2026 |
| 23/09/2026 |
Dwelling Adaptation And Extension Works |
Low |
07/10/2026 |
| 23/09/2026 |
Community Dwelling Conversion Works |
Low |
07/10/2026 |
| 23/09/2026 |
Architectural Design For Offices |
Low |
30/10/2026 |
| 23/09/2026 |
Ground Investigation For Link Roads |
Low |
16/10/2026 |
| 23/09/2026 |
Roof And Internal Works |
Low |
21/10/2026 |
| 23/09/2026 |
Landfill Site Maintenance Services |
Low |
06/10/2026 |
| 23/09/2026 |
Multidisciplinary Services For Road Scheme |
High |
23/10/2026 |
| 23/09/2026 |
Design And Installation Of Pods |
Low |
29/10/2026 |
| 22/09/2026 |
Wooden Cabin Hire For Festival |
Low |
09/10/2026 |
| 22/09/2026 |
Weighbridge Load Cell Replacement |
Low |
20/10/2026 |
| 22/09/2026 |
Enterprise Centre Upgrade Works |
Low |
16/10/2026 |
| 22/09/2026 |
Feasibility Study For Swimming Pool |
Low |
26/10/2026 |
| 22/09/2026 |
Retrofit Works For FET Colleges |
Low |
13/10/2026 |
| 22/09/2026 |
Architect-led Fire Safety Design |
High |
19/10/2026 |
| 22/09/2026 |
Road And Service Upgrade Works |
Low |
20/10/2026 |
| 21/09/2026 |
Replacement Of Windows And Doors |
Low |
13/10/2026 |
| 21/09/2026 |
Water Supply Upgrade Works |
Low |
16/10/2026 |
| 21/09/2026 |
School Maintenance And Upgrade Framework |
Low |
22/10/2026 |
| 21/09/2026 |
School Maintenance And Upgrade Framework |
Low |
22/10/2026 |
| 21/09/2026 |
School Maintenance And Upgrade Framework |
Low |
22/10/2026 |
| 21/09/2026 |
School Maintenance And Upgrade Framework |
Low |
22/10/2026 |
| 21/09/2026 |
Wooden Boardwalk Replacement Works |
High |
19/10/2026 |
| 21/09/2026 |
Community Pavilion And Public Realm (Ireland) |
High |
23/10/2026 |
| 21/09/2026 |
Forensic Framework Phase Three |
High |
16/10/2026 |
| 21/09/2026 |
Tracked Robotic Machine With Mulcher |
High |
08/10/2026 |
| 18/09/2026 |
Bridge Replacement And Rehabilitation |
Low |
20/10/2026 |
| 18/09/2026 |
Wave Generation System Supply |
Low |
12/10/2026 |
| 18/09/2026 |
Bridge Expansion Consultancy Services |
Low |
07/10/2026 |
| 18/09/2026 |
Fencing And Temporary Structures Services |
High |
22/10/2026 |
| 18/09/2026 |
Architect-led Design Team Framework |
High |
04/11/2026 |
| 18/09/2026 |
Port Hydrographic Survey Framework |
High |
20/10/2026 |