| 07/08/2026 |
Science Labs And Rooms Refurbishment (Republic of Ireland) |
Low |
04/09/2026 |
| 07/08/2026 |
Tea Room Renovation And Shop |
Low |
28/08/2026 |
| 07/08/2026 |
SEN Extension And Roof Works |
Low |
02/09/2026 |
| 07/08/2026 |
Peatland Restoration Works Panel |
Low |
07/09/2032 |
| 07/08/2026 |
Remedial Infrastructural Works |
Low |
18/09/2026 |
| 07/08/2026 |
SEN Classroom Reconfiguration Works |
Low |
28/08/2026 |
| 07/08/2026 |
Mobile Generator Supply And Services |
High |
17/09/2026 |
| 07/08/2026 |
Consultancy For Greyway Design |
Low |
27/08/2026 |
| 06/08/2026 |
Gym Refurbishment And Office Conversion |
Low |
07/09/2026 |
| 06/08/2026 |
Soil Sampling And Waste Analysis |
Low |
10/09/2026 |
| 06/08/2026 |
Topographical And Lidar Survey |
Low |
28/08/2026 |
| 06/08/2026 |
Property Management Services Framework |
High |
07/09/2026 |
| 06/08/2026 |
Flood Relief Site Investigation |
High |
09/09/2026 |
| 06/08/2026 |
Concrete Supply Framework Agreement |
High |
16/09/2026 |
| 05/08/2026 |
Refurbishment And Extension Works |
Low |
26/08/2026 |
| 05/08/2026 |
Thermal Insulation Upgrade Works |
Low |
28/08/2026 |
| 05/08/2026 |
Locker Room Refurbishment Works |
Low |
04/09/2026 |
| 05/08/2026 |
Locker Facility Refurbishment Works |
Low |
04/09/2026 |
| 05/08/2026 |
Fire Stopping Works Framework |
High |
04/09/2026 |
| 05/08/2026 |
Construction Works For Barrack Building |
Low |
04/09/2026 |
| 05/08/2026 |
Demolition And Related Works (Republic of Ireland) |
High |
05/08/2027 |
| 05/08/2026 |
Minor Building And Carpentry Services |
High |
11/09/2026 |
| 05/08/2026 |
Rhododendron Control Services |
High |
04/09/2026 |
| 05/08/2026 |
Standby Generators Maintenance Framework |
High |
04/09/2026 |
| 05/08/2026 |
Consultancy For Pier Repair Works |
High |
04/09/2026 |
| 05/08/2026 |
Bridge Rehabilitation Works 2026 |
Low |
26/08/2026 |
| 04/08/2026 |
Framework For Multifunctional Roofs Design - Prior Information Notice |
PinLow |
04/09/2026 |
| 04/08/2026 |
Storage Shed Construction Works |
Low |
04/09/2026 |
| 04/08/2026 |
Flood Relief Consultancy Services |
Low |
18/09/2026 |
| 04/08/2026 |
Infrastructure Consultancy Services |
Low |
04/09/2026 |
| 04/08/2026 |
Invasive Plant Eradication Services |
High |
16/09/2026 |
| 04/08/2026 |
Science Labs And Insulation Upgrade |
Low |
18/08/2026 |
| 04/08/2026 |
Irrigation System Installation Works (Italy) |
Low |
31/08/2026 |
| 04/08/2026 |
Irrigation System Installation Works (Italy) |
Low |
31/08/2026 |
| 04/08/2026 |
Irrigation System Installation Works |
Low |
31/08/2026 |
| 03/08/2026 |
Topographical Survey And Civil Design |
Low |
14/09/2026 |
| 03/08/2026 |
Building Refurbishment Project (Belize) - Pipeline Notice |
PinHigh |
02/09/2026 |
| 03/08/2026 |
Historic Mine Services |
High |
04/09/2026 |
| 03/08/2026 |
Water Supply Connection Design |
High |
07/09/2026 |
| 03/08/2026 |
Seismic Survey Acquisition Services |
High |
08/09/2026 |
| 03/08/2026 |
Tools And Equipment Supply |
High |
31/08/2026 |
| 31/07/2026 |
Building Fabric And Heating Upgrades |
Low |
11/09/2026 |
| 31/07/2026 |
Modular Living Facility Construction (Antarctica) |
High |
25/08/2026 |
| 31/07/2026 |
Two-storey School Extension Construction |
Low |
31/08/2026 |
| 31/07/2026 |
Pile Condition Survey Services |
Low |
18/08/2026 |
| 31/07/2026 |
Building Maintenance And Refurbishment |
Low |
07/09/2026 |
| 31/07/2026 |
Event Management And Production Services |
Low |
31/08/2026 |
| 31/07/2026 |
Science Lab Upgrades And Climate Works |
Low |
18/08/2026 |
| 31/07/2026 |
Windows And Doors |
Low |
04/09/2026 |
| 31/07/2026 |
Electrical Works For Social Housing |
High |
10/09/2026 |
| 31/07/2026 |
Mechanical Works For Social Housing |
High |
10/09/2026 |
| 31/07/2026 |
Building Materials Supply Framework |
High |
04/09/2026 |
| 30/07/2026 |
Engineering And Maintenance Qualification System |
High |
25/07/2036 |
| 30/07/2026 |
Wood Machining Supply And Services |
Low |
20/08/2026 |
| 30/07/2026 |
School Extension Construction Project |
Low |
21/08/2026 |
| 30/07/2026 |
Roof Remedial Works |
Low |
28/08/2026 |
| 30/07/2026 |
Two-storey Extension With SEN Base |
Low |
11/09/2026 |
| 30/07/2026 |
Road Safety Improvement Works |
Low |
28/08/2026 |
| 30/07/2026 |
UPS Units And Maintenance |
Low |
31/08/2026 |
| 30/07/2026 |
Urban Green Area Transformation |
High |
07/09/2026 |
| 30/07/2026 |
Heritage Park Upgrades |
High |
21/08/2026 |
| 30/07/2026 |
School Extension And Site Works |
Low |
28/08/2026 |
| 30/07/2026 |
Accommodation Reconfiguration And In-fill Works |
Low |
24/08/2026 |
| 30/07/2026 |
Heritage Centre Refurbishment And Extension |
High |
28/08/2026 |
| 30/07/2026 |
Drainage Services |
High |
24/08/2026 |
| 30/07/2026 |
Soundproofing And AC Replacement (Singapore) |
High |
12/08/2026 |
| 30/07/2026 |
Maritime Structure Conservation Works (Ireland) |
Low |
14/08/2026 |
| 30/07/2026 |
Hospital Entrance Construction Project |
Low |
28/08/2026 |
| 29/07/2026 |
Home Economics Room Refurbishment |
Low |
20/08/2026 |
| 29/07/2026 |
Community Dwelling Extension Works |
Low |
02/09/2026 |
| 29/07/2026 |
Water Supply Network Upgrade |
Low |
01/09/2026 |
| 29/07/2026 |
Biodiversity And Landscape Works (Ireland) |
Low |
28/08/2026 |
| 29/07/2026 |
Construction And Refurbishment Of Houses |
Low |
02/09/2026 |
| 29/07/2026 |
Woodwork Classroom Refurbishment |
Low |
20/08/2026 |
| 29/07/2026 |
School SEN Extensions Construction |
High |
21/08/2026 |
| 29/07/2026 |
Sports Ground Redevelopment Works |
Low |
19/08/2026 |
| 29/07/2026 |
Design And Build Contractor |
High |
04/09/2026 |
| 28/07/2026 |
Restoration Of Timber Windows |
Low |
18/08/2026 |
| 28/07/2026 |
Building Enhancement Works |
Low |
28/08/2026 |
| 28/07/2026 |
Slipway Repairs On Island |
Low |
20/08/2026 |
| 28/07/2026 |
Fire Compliance Works For Apartments |
Low |
02/09/2026 |
| 28/07/2026 |
Glasshouse Enabling Works |
Low |
03/09/2026 |
| 28/07/2026 |
Unit Fit Out And Systems |
Low |
03/09/2026 |
| 28/07/2026 |
Ground Investigations For Travel Scheme |
Low |
28/08/2026 |
| 28/07/2026 |
High Mobility Tractors Supply |
High |
04/09/2026 |
| 28/07/2026 |
Design And Build Bus Depot |
High |
28/08/2026 |
| 28/07/2026 |
Affordable Housing Development Design |
High |
25/08/2026 |
| 28/07/2026 |
Labour Services Framework |
High |
08/09/2026 |
| 28/07/2026 |
ULD Storage System Design |
High |
28/08/2026 |
| 28/07/2026 |
Mobile Flood Barrier Systems Framework |
High |
28/08/2026 |
| 27/07/2026 |
Multipurpose Telehandler Supply |
Low |
24/08/2026 |
| 27/07/2026 |
Advance Works Contract |
Low |
24/08/2026 |
| 27/07/2026 |
Landing Pontoon Replacement Works |
Low |
24/08/2026 |
| 27/07/2026 |
Second Hand Teleporter Supply |
Low |
30/08/2026 |
| 27/07/2026 |
Building Systems And Roof Upgrades |
Low |
18/08/2026 |
| 27/07/2026 |
Engineering Services For River Screens |
Low |
17/08/2026 |
| 27/07/2026 |
Active Travel Scheme Works |
Low |
27/08/2026 |
| 27/07/2026 |
Alterations And Access Upgrade Works |
Low |
24/08/2026 |
| 27/07/2026 |
Trailhead And Walkway Development |
Low |
17/08/2026 |
| 27/07/2026 |
Survey Qualification System |
High |
21/08/2033 |