| 29/05/2026 |
Functional Testing Of Pd Ag Membranes |
High |
29/06/2026 |
| 29/05/2026 |
High Temperature Superconducting Rotor System - Planned Procurement Notice |
PinHigh |
16/06/2026 |
| 29/05/2026 |
Gestational Diabetes Glucose Monitoring - Prior Information Notice |
PinLow |
12/06/2026 |
| 29/05/2026 |
UV And Visible Lasers Supply |
Low |
29/06/2026 |
| 28/05/2026 |
Water Safety Assessments And Testing |
High |
29/06/2026 |
| 28/05/2026 |
Science Laboratory Upgrades Contractor |
Low |
18/06/2026 |
| 28/05/2026 |
High-speed Camera For Research |
High |
29/06/2026 |
| 28/05/2026 |
DNA Analysis Instrumentation - Prior Information Notice |
PinLow |
02/07/2026 |
| 27/05/2026 |
Flow Cytometers And Maintenance - Pipeline Notice |
PinHigh |
01/10/2026 |
| 27/05/2026 |
Kirkpatrick-baez Mirror System |
High |
26/06/2026 |
| 27/05/2026 |
Non-nuclear Radioactive Discharge Reporting |
High |
22/06/2026 |
| 27/05/2026 |
Genetic Evaluation For Sheep Programme |
Low |
22/06/2026 |
| 27/05/2026 |
Science Lab Refurbishment Project |
High |
12/06/2026 |
| 27/05/2026 |
Replacement Equipment For Research Centre |
High |
29/06/2026 |
| 27/05/2026 |
Pathology Services Transformation Partnership |
Low |
12/06/2026 |
| 26/05/2026 |
Science Labs Refurbishment Project |
Low |
16/06/2026 |
| 26/05/2026 |
Food Hygiene Inspection Services |
High |
26/06/2026 |
| 26/05/2026 |
Physical Forensics Administration Contract - Pipeline Notice |
PinHigh |
31/05/2027 |
| 26/05/2026 |
Gas chromatograph & spectrometers |
Low |
22/06/2026 |
| 26/05/2026 |
Science Laboratory Upgrades Contractor |
Low |
17/06/2026 |
| 26/05/2026 |
Specialist Laboratory Design And Build - Pipeline Notice |
PinHigh |
01/07/2026 |
| 26/05/2026 |
Specialist Laboratory Design And Build - Pipeline Notice |
PinHigh |
01/07/2026 |
| 26/05/2026 |
Specialist Equipment Replacement And Upgrades - Pipeline Notice |
PinHigh |
01/07/2026 |
| 26/05/2026 |
Managed Equipment And Consumables Service - Pipeline Notice |
PinHigh |
25/06/2026 |
| 26/05/2026 |
Management Of Tomps Monitoring Network - Preliminary Market Engagement Notice |
PinHigh |
05/06/2026 |
| 26/05/2026 |
Flow Cytometry Instruments And Reagents - Pipeline Notice |
PinHigh |
01/12/2026 |
| 26/05/2026 |
APPLE-II Undulator Design And Delivery |
High |
25/06/2026 |
| 26/05/2026 |
Integrated Soil Sampling Service |
High |
09/07/2026 |
| 26/05/2026 |
Bioreactor Suite Supply Framework |
High |
26/06/2026 |
| 25/05/2026 |
Science Labs Refurbishment Project |
Low |
15/06/2026 |
| 25/05/2026 |
Science Lab Refurbishment Project |
Low |
15/06/2026 |
| 22/05/2026 |
Culture Media Procurement For Laboratories - Pipeline Notice |
PinHigh |
01/07/2026 |
| 22/05/2026 |
Ultrafast ICCD Camera Supply |
Low |
19/06/2026 |
| 22/05/2026 |
Advanced Equipment Servicing And Calibration - Prior Information Notice |
PinHigh |
30/06/2026 |
| 22/05/2026 |
Science Laboratory Refurbishment Works |
Low |
15/06/2026 |
| 22/05/2026 |
Construction Works For School Upgrade |
Low |
16/06/2026 |
| 22/05/2026 |
Microscopy Equipment Framework - Pipeline Notice |
PinHigh |
01/07/2026 |
| 22/05/2026 |
Optic Equipment Supply - Pipeline Notice |
PinHigh |
01/07/2026 |
| 22/05/2026 |
Soil Sample Analysis Services |
High |
19/06/2026 |
| 22/05/2026 |
Peptide Synthesis Equipment And Support |
High |
18/06/2026 |
| 22/05/2026 |
Science Lab Refurbishment Project |
High |
10/06/2026 |
| 21/05/2026 |
Peptide Synthesizer Supply And Install - Preliminary Market Engagement Notice |
PinHigh |
18/06/2026 |
| 21/05/2026 |
Particle Sizing Suite Supply |
Low |
25/06/2026 |
| 21/05/2026 |
Rack Washer Replacement Procurement |
High |
23/06/2026 |
| 21/05/2026 |
Virology Laboratory Managed Service - Preliminary Market Engagement Notice |
PinHigh |
04/06/2026 |
| 21/05/2026 |
Hybrid Force Machine In Tension - Pipeline Notice |
PinHigh |
30/09/2026 |
| 21/05/2026 |
Science Lab Refurbishment Project |
High |
08/06/2026 |
| 21/05/2026 |
ONH Analyser Supply Framework |
High |
29/06/2026 |
| 21/05/2026 |
Stack Testing And Filter Evaluation - Pipeline Notice |
PinHigh |
19/07/2026 |
| 20/05/2026 |
Multibeam Echosounder Supply |
High |
15/06/2026 |
| 20/05/2026 |
Laboratory And Preparation Room Renovation |
Low |
16/06/2026 |
| 20/05/2026 |
Proprietary Consumable Supply - Prior Information Notice |
PinLow |
19/06/2026 |
| 19/05/2026 |
Medical Assessments And Expert Services |
High |
18/06/2026 |
| 19/05/2026 |
Bio-printer For 3D Tissue Models |
High |
16/06/2026 |
| 19/05/2026 |
Laboratory Services |
Low |
17/06/2026 |
| 18/05/2026 |
Science Classroom Upgrade And Shelter |
Low |
08/06/2026 |
| 18/05/2026 |
Pharmacogenomic Testing Service |
High |
17/06/2026 |
| 18/05/2026 |
EDXRF Supply With Camera - Prior Information Notice |
PinLow |
19/06/2026 |
| 18/05/2026 |
EDXRF Supply With Camera - Prior Information Notice |
PinLow |
19/06/2026 |
| 18/05/2026 |
Engineering Equipment Supply |
Low |
03/06/2026 |
| 18/05/2026 |
Haematology Consultant Microscopes Supply - Preliminary Market Engagement Notice |
PinHigh |
01/06/2026 |
| 18/05/2026 |
3D Printer For Anatomy Models |
High |
15/06/2026 |
| 15/05/2026 |
Mechanical Compliance Testing Services |
High |
18/06/2026 |
| 15/05/2026 |
Cath Lab Refurbishment Contractor - Pipeline Notice |
PinHigh |
14/06/2026 |
| 15/05/2026 |
Laboratory Chemicals And Consumables Framework - Planned Procurement Notice |
PinHigh |
15/07/2026 |
| 15/05/2026 |
Pathology Storage And Scanning Framework |
High |
18/06/2026 |
| 15/05/2026 |
Environmental Chamber Supply And Install |
High |
15/06/2026 |
| 15/05/2026 |
Shellfish Sample Processing Services |
High |
15/06/2026 |
| 15/05/2026 |
Multimodal Spectroscopic Plate Reader |
Low |
19/06/2026 |
| 15/05/2026 |
Technical Fit Out Works - Pipeline Notice |
PinHigh |
29/06/2026 |
| 14/05/2026 |
Advanced Equipment Servicing And Calibration - Prior Information Notice |
PinHigh |
30/06/2026 |
| 14/05/2026 |
Scientific Equipment Servicing And Calibration - Prior Information Notice |
PinHigh |
30/06/2026 |
| 14/05/2026 |
Freezer Dryer Parts And Servicing |
High |
09/06/2026 |
| 14/05/2026 |
Next-generation Sequencing Framework |
High |
19/06/2026 |
| 13/05/2026 |
Single Fibre Tensile Tester |
High |
10/06/2026 |
| 13/05/2026 |
Science Classrooms Upgrade And Insulation |
Low |
03/06/2026 |
| 13/05/2026 |
X-ray Stress Analyser Supply |
Low |
04/06/2026 |
| 13/05/2026 |
Microscopes And Accessories Framework |
High |
08/06/2026 |
| 13/05/2026 |
Single Fibre Tensile Tester |
High |
10/06/2026 |
| 13/05/2026 |
Flow Cytometry Systems And Reagents - Preliminary Market Engagement Notice |
PinHigh |
31/07/2026 |
| 13/05/2026 |
Confocal Microscope System |
High |
09/06/2026 |
| 13/05/2026 |
Confocal Microscope System |
High |
09/06/2026 |
| 13/05/2026 |
Science Lab And Room Upgrade |
Low |
02/06/2026 |
| 12/05/2026 |
Drinking Water Testing Audit |
Low |
03/06/2026 |
| 12/05/2026 |
HIV Screening And Management - Pipeline Notice |
PinHigh |
11/06/2026 |
| 12/05/2026 |
Cleft Operating Microscope Supply |
High |
10/06/2026 |
| 12/05/2026 |
RF, Thz, Optical Equipment Supply |
High |
12/06/2026 |
| 11/05/2026 |
Life Sciences Equipment And Services - Pipeline Notice |
PinHigh |
01/09/2026 |
| 11/05/2026 |
Microbiology Diagnostic Services - Preliminary Market Engagement Notice |
PinHigh |
05/06/2026 |
| 11/05/2026 |
Healthcare AI Open Framework |
High |
07/07/2026 |
| 11/05/2026 |
Marine Benthic Sample Processing |
High |
05/06/2026 |
| 08/05/2026 |
General Purpose Sputtering Tool |
High |
09/06/2026 |
| 08/05/2026 |
Electrochemical Capacitance Voltage System |
High |
08/06/2026 |
| 08/05/2026 |
Direct Write Laser Lithography Tool |
High |
09/06/2026 |
| 08/05/2026 |
Plant Extraction System Supply |
Low |
12/06/2026 |
| 08/05/2026 |
Cryogenic Control System Upgrade |
High |
17/07/2026 |
| 08/05/2026 |
Copper Electroplating Tool Supply |
High |
09/06/2026 |
| 08/05/2026 |
Commercial Use Of Cleanroom Facility - Preliminary Market Engagement Notice |
PinHigh |
05/06/2026 |
| 08/05/2026 |
Chemical Mechanical Polishing Tool |
High |
08/06/2026 |
| 08/05/2026 |
DPS For Teaching Equipment Supply |
High |
05/05/2031 |