| 28/08/2026 |
Laboratory Refurbishment Contractor |
High |
25/09/2026 |
| 28/08/2026 |
Pharmaceutical Refrigerators Supply Framework |
High |
28/09/2026 |
| 28/08/2026 |
Drug, Alcohol And DNA Testing - Preliminary Market Engagement Notice |
PinHigh |
11/09/2026 |
| 28/08/2026 |
Cleanroom Design And Build - Preliminary Market Engagement Notice |
PinHigh |
16/09/2026 |
| 28/08/2026 |
Liquid Handling Robotics RFI - Prior Information Notice |
PinLow |
11/09/2026 |
| 27/08/2026 |
Framework For Laboratory Supplies |
High |
05/10/2026 |
| 27/08/2026 |
Platelet Storage Equipment Supply - Preliminary Market Engagement Notice |
PinHigh |
11/09/2026 |
| 27/08/2026 |
Automated Viral Inactivation Systems - Preliminary Market Engagement Notice |
PinHigh |
14/09/2026 |
| 27/08/2026 |
Controlled Environment Facility Design - Preliminary Market Engagement Notice |
PinHigh |
21/09/2026 |
| 27/08/2026 |
Automated Thermal Desorber System |
High |
25/09/2026 |
| 27/08/2026 |
LC-MS/MS Maintenance And Support |
High |
30/09/2026 |
| 26/08/2026 |
Electrochemical Workstation Supply And Install |
Low |
16/09/2026 |
| 26/08/2026 |
Maintenance Of Theatre Equipment |
High |
23/09/2026 |
| 26/08/2026 |
Medical Refrigeration Equipment - Preliminary Market Engagement Notice |
PinHigh |
16/09/2026 |
| 26/08/2026 |
Sterile Boot Swab Kits Supply - Planned Procurement Notice |
PinHigh |
31/01/2027 |
| 26/08/2026 |
POCT For Health Checks |
High |
23/09/2026 |
| 26/08/2026 |
Laboratory Services For Water Analysis |
High |
15/09/2026 |
| 26/08/2026 |
Autonomous Perimeter Patrolling |
Low |
07/09/2026 |
| 25/08/2026 |
Design And Build Services - Preliminary Market Engagement Notice |
PinHigh |
25/09/2026 |
| 25/08/2026 |
Radon Monitoring And Surveys |
High |
24/09/2026 |
| 24/08/2026 |
Automated Histology Slide System |
Low |
14/09/2026 |
| 24/08/2026 |
High Precision Motion Control System |
High |
21/09/2026 |
| 24/08/2026 |
Real-time PCR Systems Supply - Preliminary Market Engagement Notice |
PinHigh |
15/09/2026 |
| 21/08/2026 |
Private Water Supply Sampling |
Low |
21/10/2026 |
| 21/08/2026 |
Equipment Servicing And Maintenance |
High |
31/08/2026 |
| 21/08/2026 |
Underwater Imaging Instrument Supply |
Low |
14/09/2026 |
| 21/08/2026 |
Robotic Autonomous Data Collection |
Low |
07/09/2026 |
| 21/08/2026 |
Laboratory Consumables And Chemicals Supply |
High |
07/10/2026 |
| 21/08/2026 |
Environmental Chamber Supply And Setup |
High |
14/09/2026 |
| 20/08/2026 |
Microgravity Measurement System Supply |
Low |
10/09/2026 |
| 20/08/2026 |
Real-time PCR Instruments Supply - Pipeline Notice |
PinHigh |
27/11/2026 |
| 20/08/2026 |
IR Camera For Testing - Preliminary Market Engagement Notice |
PinHigh |
23/09/2026 |
| 20/08/2026 |
Salinity Sample Analysis Services |
High |
21/09/2026 |
| 19/08/2026 |
Diagnostic IR Camera Systems |
Low |
07/09/2026 |
| 19/08/2026 |
Automated SPE Instrument Supply |
Low |
09/09/2026 |
| 19/08/2026 |
Multipole Wiggler Design And Delivery |
High |
21/09/2026 |
| 19/08/2026 |
LC-MS System Supply And Install |
High |
25/09/2026 |
| 19/08/2026 |
Continuous Wave CO2 Laser System |
Low |
08/09/2026 |
| 18/08/2026 |
AMR Transmission And Origins Study |
High |
28/09/2026 |
| 18/08/2026 |
Laboratory Equipment Supply Project (Malawi) |
High |
17/09/2026 |
| 18/08/2026 |
GC-MS System With Pyrolyser |
Low |
09/09/2026 |
| 18/08/2026 |
Blood Gas Managed Service - Preliminary Market Engagement Notice |
PinHigh |
01/09/2026 |
| 17/08/2026 |
Design And Build FALCON Valve |
High |
18/09/2026 |
| 17/08/2026 |
Laboratory Equipment Supply (Malawi) - Preliminary Market Engagement Notice |
PinHigh |
16/09/2026 |
| 14/08/2026 |
Headspace Gas Chromatograph System |
High |
11/09/2026 |
| 14/08/2026 |
Thermal Vacuum Chamber Supply |
High |
18/09/2026 |
| 14/08/2026 |
Installation Of ICP Etch Tool |
High |
14/09/2026 |
| 14/08/2026 |
Optical Components Framework - Preliminary Market Engagement Notice |
PinHigh |
21/09/2026 |
| 14/08/2026 |
Road Materials Testing Services - Prior Information Notice |
PinLow |
02/11/2026 |
| 13/08/2026 |
Automated Immunohaematology Solution - Preliminary Market Engagement Notice |
PinHigh |
10/09/2026 |
| 13/08/2026 |
Servicing And Spares For Equipment |
High |
14/09/2026 |
| 12/08/2026 |
AMR E. Coli And Salmonella Survey |
High |
01/09/2026 |
| 12/08/2026 |
Solid Sample TOC Analyser |
Low |
08/09/2026 |
| 12/08/2026 |
Benchtop Liquid Dispensing Platform |
Low |
08/09/2026 |
| 12/08/2026 |
Body Composition Device Supply |
Low |
09/09/2026 |
| 11/08/2026 |
Soil Sample Analysis Project |
High |
01/09/2026 |
| 10/08/2026 |
Specialist Filtration Framework |
High |
09/09/2026 |
| 10/08/2026 |
Cryopreservation-grade DMSO Supply - Preliminary Market Engagement Notice |
PinHigh |
11/09/2026 |
| 10/08/2026 |
Large Scale PALD Tool |
High |
11/09/2026 |
| 10/08/2026 |
Delivery Of Gas Analysers And Chambers |
High |
08/09/2026 |
| 07/08/2026 |
RFID Sample Tracking Solution - Preliminary Market Engagement Notice |
PinHigh |
07/09/2026 |
| 07/08/2026 |
Aquatic Invertebrate Sampling Analysis |
Low |
31/08/2026 |
| 07/08/2026 |
Molecular Urine Testing Service - Prior Information Notice |
PinHigh |
06/09/2026 |
| 06/08/2026 |
Nano-mechanical Characterisation System |
High |
09/09/2026 |
| 06/08/2026 |
GCMS System Replacement Procurement |
High |
09/09/2026 |
| 06/08/2026 |
Soil Sampling And Waste Analysis |
Low |
10/09/2026 |
| 06/08/2026 |
Containerised Laboratory Facilities (Caribbean) |
High |
04/09/2026 |
| 06/08/2026 |
Matrix Plasma Asher Supply |
High |
09/09/2026 |
| 06/08/2026 |
Inductively Coupled Plasma System |
High |
09/09/2026 |
| 06/08/2026 |
Long-read Sequencing And Analysis |
Low |
02/09/2026 |
| 05/08/2026 |
High Accuracy Motion System Supply |
High |
07/09/2026 |
| 05/08/2026 |
Prostate Cancer Screening Programme - Prior Information Notice |
PinHigh |
07/12/2026 |
| 05/08/2026 |
Wafer-level Optical Tester Supply |
High |
07/09/2026 |
| 04/08/2026 |
Double Door Steam Autoclave |
High |
21/09/2026 |
| 04/08/2026 |
Motion Analysis Equipment Supply |
High |
01/09/2026 |
| 04/08/2026 |
Test Rig Installation Project - Preliminary Market Engagement Notice |
PinHigh |
31/08/2026 |
| 04/08/2026 |
Teledermatology And Telemicrobiology Framework - Prior Information Notice |
PinHigh |
06/10/2026 |
| 04/08/2026 |
Bioreactor Equipment Procurement |
High |
03/09/2026 |
| 03/08/2026 |
Safety Cabinet Maintenance Services |
High |
02/09/2026 |
| 03/08/2026 |
Automated Laser Chip Tester Supply |
High |
07/09/2026 |
| 03/08/2026 |
Submicron Flip-chip Die Bonder |
High |
04/09/2026 |
| 03/08/2026 |
Optical Alignment And Packaging System |
High |
04/09/2026 |
| 03/08/2026 |
Laser Waveguide Writing Equipment |
High |
04/09/2026 |
| 03/08/2026 |
Greenhouse Gas Inventory Research |
High |
27/09/2026 |
| 31/07/2026 |
Die Inspection Sorter Supply |
High |
01/09/2026 |
| 31/07/2026 |
Optical Transceiver Tester Supply |
High |
01/09/2026 |
| 31/07/2026 |
Fabrication Services Framework For Circuits |
High |
16/09/2026 |
| 30/07/2026 |
Hermetic Sealing Kit Supply |
High |
01/09/2026 |
| 30/07/2026 |
Precision Analysis Platform Supply |
High |
31/08/2026 |
| 30/07/2026 |
Development Of Fuel Cycle Specifications |
High |
03/09/2026 |
| 30/07/2026 |
Service Contracts For Laboratory Instruments |
High |
31/08/2026 |
| 27/07/2026 |
Concept Design For Tritium System |
High |
07/09/2026 |
| 24/07/2026 |
Integrated Vertical Press Supply |
High |
03/09/2026 |
| 23/07/2026 |
Probiotic Effects On Broiler Campylobacter - Planned Procurement Notice |
PinHigh |
13/10/2026 |
| 23/07/2026 |
Managed Microbiology Services Contract - Prior Information Notice |
PinHigh |
11/01/2027 |
| 22/07/2026 |
Corrosion Testing Framework Services |
High |
08/09/2026 |
| 21/07/2026 |
Life Sciences Equipment And Services - Preliminary Market Engagement Notice |
PinHigh |
12/10/2026 |
| 21/07/2026 |
Stack Testing And Evaluation - Planned Procurement Notice |
PinHigh |
18/09/2026 |
| 20/07/2026 |
Laboratory Services For Alcohol Testing - Preliminary Market Engagement Notice |
PinHigh |
|
| 16/07/2026 |
Highway Materials Testing Framework - Planned Procurement Notice |
PinHigh |
16/09/2026 |